Provide a two-lane entrance ramp from the Interchange 145 Toll Plaza to GSP Southbound
Widen GSP northbound to re‐establish a two-lane deceleration lane to the Interchange 145 Toll Plaza
Remove exiting Toll Plaza at Interchange 145
Minimize construction impacts on both the GSP and the local roadway network
Complete all work on the GSP within the existing right‐of‐way
CONSTRUCTION:
Construction work to be performed in three (3) stages
Temporary traffic shifts within the Toll Plaza will be utilized to facilitate the work
Work to begin on or about July 16, 2018
Location Updates
July 13, 2018
During the week of 07/16/18, initial site preparations will be performed during the day and at night in the northbound exiting Toll Plaza area in advance of the Toll Booth removal and plaza pavement reconstruction. Nighttime lane closures will be utilized for this work. Minor traffic impacts are expected. Work will be supported by State Police as necessary.
On or about 07/23/18, the Garden State Parkway will implement "One-Way Tolling" at Interchange 145. The northbound GSP exit toll at Interchange 145 will be eliminated and the entrance toll will double.
During the weeks of 07/23/18 and 07/30/18, traffic exiting the northbound GSP at Interchange 145 will be shifted to the left of the plaza to accommodate Toll Booth removal work and plaza pavement reconstruction. The work to remove the Toll Plaza and reconstruct the pavement will be performed 24-hours a day, 7 days a week for two weeks. Vehicles will pass through the two left toll lanes without paying a toll.
July 6, 2018
During the week of 07/16/18, initial site preparations will be performed during the day and at night in the northbound exiting Toll Plaza area in advance of the Toll Booth removal and plaza pavement reconstruction. Nighttime lane closures will be utilized for this work. Minor traffic impacts are expected. Work will be supported by State Police as necessary.
On or about 07/23/18, the Garden State Parkway will implement "One-Way Tolling" at Interchange 145. The northbound GSP exit toll at Interchange 145 will be eliminated and the entrance toll will double.
During the weeks of 07/23/18 and 07/30/18, traffic exiting the northbound GSP at Interchange 145 will be shifted to the left of the plaza to accommodate Toll Booth removal work and plaza pavement reconstruction. The work to remove the toll plaza and reconstruct the pavement will be performed 24 hours a day, 7 days a week for two weeks. Vehicles will pass through the two left toll lanes without paying a toll.
Starting the week of 05/13/19 and continuing through 06/24/19, new roadway curb, sidewalk and driveway aprons will be constructed along Oraton Parkway northbound and southbound […]